Innovative Bridge Research and Construction (IBRC)

Quarterly Reports Other Documents Final Report
Final Report

Primary Investigator

Mike Oliva
University of Wisconsin – Madison
1415 Engineering Drive, 1214 EH
Madison, WI 53706
oliva@engr.wisc.edu

Abstract

The deck of short span bridges is often supported on cast-in-place abutments that are supported by a pile driven system, known as an A5 sub-structure.  The A5 sub-structure has been costly in comparison to other sub-structures for stream crossing structures in Wisconsin.  In 2004, the A5 sub-structure slab bridges cost approximately $80 per square foot compared to all other types of slab bridges at approximately $50 per square foot.  This excessive cost is another reason for investigating an alternate structure system for these bridges structures.

Objectives

The goal of this project is to design and construct an effective and efficient composite system of precast sub-structure elements and stay-in-place forms for super-structure for short span bridges to reduce the overall costs and risks of these structures in the state of Wisconsin.  The results are expected to be applicable to future bridge structures.

Tasks

  1. Preliminary design
  2. Integrate the precast substructure with a pile system that is driven before bridge is closed
  3. Construction
  4. Testing
  5. Report results

Project Information

  • Duration: 12 months
  • Dates: 6/5/2007 – 8/31/2010
  • Budget: $289,567
  • Student Involvement: One graduate student
  • Modal Orientation: Highway
  • Project ID: CFIRE 02-15